Canaveral Port Authority Cruise Terminal 3

Port Canaveral, Florida

350,000 sq ft cruise ship terminal

Providing fabrication and installation shop drawings for all HVAC piping

 

General Dynamics, Electric Boat

Cape Canaveral Air Force Station, FL

Providing fabrication and installation shop drawings and weld maps for the following piping systems; missile gas, missile heating and cooling, high pressure air, hydraulics, missile hydraulics, missile dehumidifying and drying system, GN2, pure water, low pressure air, chilled water

NASA

Vehicle Assembly Building High Bay Three - (ECS)

Kennedy Space Center, FL

Perform 3D laser scanning and lead coordination for all MEP services

 

NASA

Booster Fabrication Facility

Kennedy Space Center, FL

Performed 3D Laser scans of the existing facility

coordinated and fabricated all new chilled water and condenser water piping

for 3 new chillers and pumps, 18" condenser water and 14" chilled water piping

Blue Origin Launch Facility - ECS - fluid system

Cape Canaveral Air Force Station, FL

Providing fabrication and installation shop drawings and weld maps for the ECS piping system, chillers, cooling towers,  cooling chambers and pumps

 

UF Veterinary of Medicine - Central Energy Plant

University of Florida - Gainesville, FL

Spool all piping systems for fabrication, create weld maps for each system and their components. 20" chilled , 24" condenser water, 10" steam, 4 new chillers, cooling towers, 3 boilers, 8 pumps

ESE Magnolia school, Orange Co. School Board

providing sheet metal and piping fabrication and installation drawings

Viera Elementary school

providing plumbing installation drawings