Blue Origin NG GS1 Simulator
Cape Canaveral Air Force Station, FL
Providing fabrication structural shop drawings for simulator launch system
NASA
Vehicle Assembly Building High Bay Three - (ECS)
Kennedy Space Center, FL
Perform 3D laser scanning and lead coordination for all MEP services
Blue Origin Launch Facility - ECS - fluid system
Cape Canaveral Air Force Station, FL
Providing fabrication and installation shop drawings and weld maps for the ECS
piping system, chillers, cooling towers, cooling chambers and pumps, GN2 piping
UF Veterinary of Medicine - Central Energy Plant
University of Florida - Gainesville, FL
Spool all piping systems for fabrication, create weld maps for each system and their components. 20" chilled , 24" condenser water, 10" steam, 4 new chillers, cooling towers, 3 boilers, 8 pumps
Bachelor Enlisted Quarters
Marine Corps Base - Kaneohe Bay, Hawaii
Four story barracks, storage buildings and chiller plant, providing
HVAC sheet metal, piping and plumbing fabrication and installation shop drawings
BYU Hawaii - Science and Math Building
Brigham Young University - Laie, Hawaii
Three story building, providing
HVAC sheet metal, piping and plumbing fabrication and installation shop drawings